On December 26, 2019, the Ministry of Construction issued Circular No. 15/2019 / TT-BXD guiding the determination of construction labor unit price. This Circular takes effect from February 15, 2020, replacing Circular No. 05/2016 / TT-BXD guiding the determination of labor unit prices in construction investment expense management.
Accordingly, the content of construction labor unit prices is specified as follows:
– Workday unit price of a construction worker is the workday unit price of a worker directly engaged in construction production, a driver, an operator of construction machines and equipment and a survey engineer; ship captains, mate captains, river ship operators, seagoing ships, sailors, mechanics and technicians; artisans, divers work under normal conditions.
– Workday unit price of a construction consultant is the unit price of a construction consultant in the country, including senior engineers and project managers; main engineers and department heads; engineer; technicians of intermediate, college, vocational training level; in which, including all salaries, salary allowances, insurance premiums which are the responsibility of the employees to be paid according to regulations (social insurance, health insurance, unemployment insurance, funding Union).
– The unit price of construction workers of particular jobs is the unit price of construction workers working in dangerous and hazardous conditions (construction works of steep hills and tunnels; construction works on islands and islands. and some other works of particular nature).
– Construction labor unit prices are surveyed, determined and published according to 10 construction work groups in Appendix 2 to this Circular. As for the 11th construction workers group, which is a separate construction work group, the survey and announcement of construction labor unit prices of this group depend on the specific characteristics of each locality.
– Unit price of construction consultancy workers is surveyed, determined and announced according to 04 groups of construction consultancy jobs published in Appendix 3 of this Circular.
Circular 15/2019/TT-BXD in particular or the current relevant legal documents in general have had fundamental changes that contribute to making labor pricing in construction become more practical, withdrawing The gap between labor prices in the construction market and labor prices is determined by legal bases.